In case anyone is curious, there was a presentation to the LAWA board in April that included updates on all the approved LAX terminal renovations/expansions.
https://lawa.granicus.com/MetaViewer.php?view_id=4&clip_id=729&meta_id=49675
I believe this update does not include Terminal 0 or 9 because those projects are still in the initial planning stages and have not yet been formally approved to start.
https://lawa.granicus.com/MetaViewer.php?view_id=4&clip_id=729&meta_id=49675
I believe this update does not include Terminal 0 or 9 because those projects are still in the initial planning stages and have not yet been formally approved to start.
#92
Join Date: Mar 2008
Location: Fort Lauderdale, FL
Posts: 3,359
Thank you, BillBurn. The amount of money they're spending at LAX is staggering. I readily admit that I'm a pessimist when it comes to these types of projects. I have the suspicion that once everything is completed, the passenger experience will continue to be mediocre, at best.
#93




Join Date: Oct 2015
Programs: AA: EXP, 1MM DL: Gold, 1MM Marriott: Ambassador, LTT
Posts: 470
An April 22 update on the APM to the board mentions that they now expect to complete it "in the second half of 2023" which a 3-6 month delay. This is a problem because the CONRAC (which is largely on schedule) can't open until the APM is finished.
https://lawa.granicus.com/MetaViewer...&meta_id=49677
The ITW West looks like it will open by early fall of this year, but until the APM is completed there will be bus shuttles to and from that facility.
https://lawa.granicus.com/MetaViewer...&meta_id=49677
The ITW West looks like it will open by early fall of this year, but until the APM is completed there will be bus shuttles to and from that facility.
#94
FlyerTalk Evangelist




Join Date: Nov 2013
Location: Los Angeles
Posts: 15,363
Since Lot E seems to be staying closed, it seems like they're just going to not bother re-opening E and then move those parkers to ITF West. The nice thing about ITFW is that it's a reasonable walk from the CTA - I was doing that walk regularly to Lot C as it was shrinking and the bus service was deteriorating.
#95




Join Date: Mar 2010
Location: LAX
Programs: AA Plat, DL Gold, AS, UA, IHG Plat
Posts: 2,601
Edit: I made a post about the updated environmental review documents for Concourse 0 and Terminal 9 but later realized it should be in the other thread since it is not under construction.
I reposted in the Concourse 0 and Terminal 9 thread: LAX moves forward with plans for Concourse 0 and Terminal 9
I reposted in the Concourse 0 and Terminal 9 thread: LAX moves forward with plans for Concourse 0 and Terminal 9
Last edited by bzcat; Jun 2, 2021 at 10:27 pm
#96
Moderator: Travel Safety/Security, Travel Tools, California, Los Angeles; FlyerTalk Evangelist




Join Date: Dec 2009
Location: LAX
Programs: oneword Emerald
Posts: 24,795
Terminals 2 and 3.
Last edited by TWA884; Oct 17, 2021 at 1:29 pm Reason: Update link to the image, the old one no longer works
#97
FlyerTalk Evangelist
Join Date: Jun 2010
Location: TOA
Programs: HH LTDiamond, Marriott LTPP/Platinum Premier, Hyatt Lame-ist, UA MM LT1P
Posts: 21,195
Wonder when all original 1960s LAX terminal buildings will eventually be replaced:
Source: airporthistory.org article
David
David
#98
FlyerTalk Evangelist




Join Date: Nov 2013
Location: Los Angeles
Posts: 15,363
Some time, billions of years from now, well after the sun goes red giant, killing all life on earth, and the stuff that makes up the earth is eventually recycled into new planet material somewhere. Some of that material may end up in airport terminals. If humans manage to make it off Earth before the red giant stage, they'll probably build a New Los Angeles on New Earth, and that city is likely to have an Air and Space Port. The buildings there will probably be inspired by the current LAX and might be considered replacements. If we're lucky it will be possible to travel airside between all the terminals.
#99




Join Date: Mar 2010
Location: LAX
Programs: AA Plat, DL Gold, AS, UA, IHG Plat
Posts: 2,601
T2 and T5 satellite were all razed and rebuilt with new concourse, similar to what is happening with T3 now.
T4/6/7 satellite are still there in theory but they've been completely gutted to frame at least twice and nothing is left from the original 1960.
I guess the underground tunnels are still there. Edit: I guess based on the photo, the linear T8 concourse could be from 1960s but I'm not sure if the structure was replaced at some point.
Last edited by bzcat; Jun 21, 2021 at 12:22 pm
#100
Moderator: Travel Safety/Security, Travel Tools, California, Los Angeles; FlyerTalk Evangelist




Join Date: Dec 2009
Location: LAX
Programs: oneword Emerald
Posts: 24,795
T2 and T5 satellite were all razed and rebuilt with new concourse, similar to what is happening with T3 now.
T4/6/7 satellite are still there in theory but they've been completely gutted to frame at least twice and nothing is left from the original 1960.
I guess the underground tunnels are still there.
T4/6/7 satellite are still there in theory but they've been completely gutted to frame at least twice and nothing is left from the original 1960.
I guess the underground tunnels are still there.
#101
FlyerTalk Evangelist
Join Date: Jun 2010
Location: TOA
Programs: HH LTDiamond, Marriott LTPP/Platinum Premier, Hyatt Lame-ist, UA MM LT1P
Posts: 21,195
From my post over in the UA forum (Google Maps satellite shot from above, circa 2020 data) - you can see the historic 1960-era cores of Terminals 3, 4, 5, 6 and 7.:
David
#102
FlyerTalk Evangelist




Join Date: Nov 2013
Location: Los Angeles
Posts: 15,363
The Century Blvd bridge will be closed midnight to 4 am from Aug 5-21 for construction of the People Mover guideway.
Details with detours routes are posted online here
Details with detours routes are posted online here
#103
FlyerTalk Evangelist

Join Date: Feb 1999
Location: Seat 1A, Juice pretty much everywhere, Mucci des Coins Exotiques
Posts: 34,337
So I walked past the new "train" station that LA Metro has built by Century and Aviation. It all looks sparkling new and has lots of lighting at night and...it is closed off. I'm not surprised by delayed construction projects in LA, but with all the hub bub about conservation and the environment and rolling blackouts, should they really be lighting up non-operating train station every night?
#104




Join Date: Oct 2015
Programs: AA: EXP, 1MM DL: Gold, 1MM Marriott: Ambassador, LTT
Posts: 470
So I walked past the new "train" station that LA Metro has built by Century and Aviation. It all looks sparkling new and has lots of lighting at night and...it is closed off. I'm not surprised by delayed construction projects in LA, but with all the hub bub about conservation and the environment and rolling blackouts, should they really be lighting up non-operating train station every night?
#105




Join Date: Oct 2015
Programs: AA: EXP, 1MM DL: Gold, 1MM Marriott: Ambassador, LTT
Posts: 470
Just FYI in case people had not seen this already, but in early October the BOAC approved the Final Environmental Impact Statement for the construction of Terminal 0 and Terminal 9.
The current project schedule is designed to complete both terminals prior to the 2028 Olympics. Completion of the 8-gate MSC South extension, which needs to be completed prior to the start of construction on Terminal 9, appears scheduled for end of 2024.
AFAIK despite this schedule, the Board has yet to actually approve a budget or construction start date for the project. While LAWA has said it remains committed to its capital spending despite the financial impacts from COVID it wouldn't be a surprise if the project is significantly delayed due to COVID-related issues.
The current project schedule is designed to complete both terminals prior to the 2028 Olympics. Completion of the 8-gate MSC South extension, which needs to be completed prior to the start of construction on Terminal 9, appears scheduled for end of 2024.
AFAIK despite this schedule, the Board has yet to actually approve a budget or construction start date for the project. While LAWA has said it remains committed to its capital spending despite the financial impacts from COVID it wouldn't be a surprise if the project is significantly delayed due to COVID-related issues.