Building Progress DXB and DWC and news updates
#1846
Original Poster
Join Date: Oct 2010
Posts: 2,095
OPINION: Is Gulf carrier expansion finally at an end?
https://www.flightglobal.com/news/ar...an-end-432947/
https://www.flightglobal.com/news/ar...an-end-432947/
#1848
Original Poster
Join Date: Oct 2010
Posts: 2,095
STC interview on how the airline is dealing with a difficult air travel environment.
https://www.emirates.com/ae/english/...&stop_mobi=yes
https://www.emirates.com/ae/english/...&stop_mobi=yes
#1849
Join Date: Mar 2011
Posts: 724
STC interview on how the airline is dealing with a difficult air travel environment.
https://www.emirates.com/ae/english/...&stop_mobi=yes
https://www.emirates.com/ae/english/...&stop_mobi=yes
-No mention of premium economy, rather just talking about 'enhancing' of current product.
-A three-cabin design on the new 777X has been finalized.
-Bar redesign on the 380 finalized.
-New first class soon to be introduced.
-Remain 10 abreast on the 380.
#1851
Join Date: Nov 2013
Posts: 5,454
If they could put it by UL1 (although aft a bit so there isn't too much of a noise issue into F) and have some J service start there, that would do wonders for the service efficiency in J on an A380, imho.
#1852
Original Poster
Join Date: Oct 2010
Posts: 2,095
Dubai loans loom for airport expansion and Expo 2020 - sources
http://www.cnbc.com/2017/01/09/reute...--sources.html
http://www.cnbc.com/2017/01/09/reute...--sources.html
#1853
Original Poster
Join Date: Oct 2010
Posts: 2,095
Will It Be a Borderless World for Emirates Under Trump?
https://www.bloomberg.com/news/video...es-under-trump
https://www.bloomberg.com/news/video...es-under-trump
#1854
Join Date: May 2014
Location: Shetland, uk
Programs: Skywards silver
Posts: 247
that could actually work quite well. Be interesting to see what happens.
#1855
Original Poster
Join Date: Oct 2010
Posts: 2,095
Arab Center for Engineering Studies (ACES) has been awarded a major geotechnical investigation contract for the Al Maktoum International Airport in Dubai.
The soil investigation works are being carried out for the expansion of the existing airport facilities in view of the forthcoming Expo 2020 in Dubai.
The development comprises construction of an additional terminal building, concourses and runways, and other ancillary structures.
The scope of work includes drilling of 600 boreholes to depths ranging from 15m to 50m, involving a total of more than 12,000 linear metres besides excavation of 28 trial pits.
http://www.constructionweekonline.co...ktoum-airport/
The soil investigation works are being carried out for the expansion of the existing airport facilities in view of the forthcoming Expo 2020 in Dubai.
The development comprises construction of an additional terminal building, concourses and runways, and other ancillary structures.
The scope of work includes drilling of 600 boreholes to depths ranging from 15m to 50m, involving a total of more than 12,000 linear metres besides excavation of 28 trial pits.
http://www.constructionweekonline.co...ktoum-airport/
#1857
FlyerTalk Evangelist
Join Date: Nov 2005
Location: Phoenix, AZ
Programs: AA Gold AAdvantage Elite, Rapids Reward
Posts: 38,353
#1859
Join Date: Oct 2014
Location: Europe
Programs: EK plat, ex-FB gold, Accor plat
Posts: 1,076
1/ The JCL loos will still be aft ? Is it really a good thing that the bar and the loos are separated ?
2/ Having two JCL galleys (that's your idea right ?) would increase total galley space and won't help stock optimization of dishes. No ?
#1860
Join Date: Nov 2013
Posts: 5,454
With the overlap between EK F and J catering (and wines), I don't think a combined F/J galley with bar at the front will cause too much inefficiency. You could always repurpose the front F bar that is hardly used for additional F only storage.