Building Progress DXB and DWC and news updates
 
I will keep you guy's updated every month from now on untill the new concourse is finished.

http://i56.tinypic.com/33dlemc.jpg

http://i51.tinypic.com/2uhv2oh.jpg

You get a good idea how big this project is.

DYKWIA Jan 30, 2011 9:23 am

I'd guess still a couple of years from completion then?

What's the status of the new Jebel Ali airport? Has that been put on hold for the time being?

Cheers,
Rick

Flying Fireman Jan 30, 2011 6:51 pm

Thanks for that was through DXB a few days ago but forgot to look.

Might stop them bloody bus transfers when it opens, mind you - did we not say that when terminal three opened a couple of years back !!!!



Regards
Flying Fireman

ung1 Jan 30, 2011 6:53 pm


Originally Posted by DYKWIA (Post 15765466)
I'd guess still a couple of years from completion then?

What's the status of the new Jebel Ali airport? Has that been put on hold for the time being?

Cheers,
Rick

Last I checked the first runway was complete and I they have started cargo operations. But they did push back the opening of the passenger terminal by at least a year. I think it's only after concourse 3 opens and EK starts overflowing from there, that they'll do something about the new airport.

I really don't understand their expensive strategy of T3 being temporary for EK and them eventually moving to the new airport. I say temporary because the rate at which EK is growing, it won't take 8 years to fill up the new concourse.

Zol Jan 30, 2011 11:32 pm

I don't see EK moving into JXB anytime soon with all the investment ploughed into T3. They are going to shift Fly Dubai there initially with EK possibly following but more later than sooner.

Although as ung1 said, with new aircrafts coming in at around 2 per month, they will struggle with space !

ung1 Jan 30, 2011 11:44 pm


Originally Posted by khalid26 (Post 15769591)
I don't see EK moving into JXB anytime soon with all the investment ploughed into T3. They are going to shift Fly Dubai there initially with EK possibly following but more later than sooner.

Although as ung1 said, with new aircrafts coming in at around 2 per month, they will struggle with space !

They could move other airlines into T3. T1 is in a pretty sad state anyway. I hope EK doesn't take over T1 and move everyone else to JXB!

ung1 Jan 30, 2011 11:54 pm


Originally Posted by khalid26 (Post 15769591)
I don't see EK moving into JXB anytime soon with all the investment ploughed into T3. They are going to shift Fly Dubai there initially with EK possibly following but more later than sooner.

Although as ung1 said, with new aircrafts coming in at around 2 per month, they will struggle with space !


Originally Posted by ung1 (Post 15769631)
They could move other airlines into T3. T1 is in a pretty sad state anyway. I hope EK doesn't take over T1 and move everyone else to JXB!

Btw it's DWC now and no longer JXB.

NOIR Jan 31, 2011 3:26 am

Here you see the cladding better.

http://i55.tinypic.com/9k79zk.jpg

kilic16slx Jan 31, 2011 5:07 am


Originally Posted by khalid26 (Post 15769591)
I don't see EK moving into JXB anytime soon with all the investment ploughed into T3. They are going to shift Fly Dubai there initially with EK possibly following but more later than sooner.

Although as ung1 said, with new aircrafts coming in at around 2 per month, they will struggle with space !

Being in the construction sector, I can assure you that DWC, with the financials of Dubai (amount of debt, credit ratings, cash resources etc.), is a project on paper only, for the time being.

They can only have it realized if they manage a BOO or BOT based contract, which again due to the CDS ratings of Dubai, is not feasable at the moment.

So we have to stick with the T3 and coming T4.

NOIR Jan 31, 2011 5:44 am

I think if they find a way, and spot for T4, maybe a T5-T6, and a way to build two, or three new runway's they could save a lot of money.

It all comes down to do they really need a new airport in these hard economic conditions ? They need to start spending money wisely.

Hyperacusis Jan 31, 2011 9:20 am

My understanding is that DWC is currently open, and only for very few cargo flights. Apparently LCCs will be the first to transition there, followed by all non-EK carriers, leaving DXB to EK.

Not sure how accurate this is but it comes from somebody who currently works in DWC's control tower.

Zol Jan 31, 2011 11:51 am


Originally Posted by ung1 (Post 15769653)
Btw it's DWC now and no longer JXB.

I stand corrected.

NOIR Feb 16, 2011 7:34 am

Here's another pic

http://i55.tinypic.com/21ngjtv.jpg

NOIR Feb 28, 2011 6:20 am

http://i52.tinypic.com/33w4pwy.jpg

NOIR Mar 26, 2011 6:40 am

http://www.gigapan.org/gigapans/72785/

gerald.d's gigaspan of Dubai. If you click the third pic it will zoom into the airport. The airbridges are progressing really good.

Gerald if I'm correct has a worlds record with the amount of pixels in his photos. These are numerous photos joined to make one big picture.


All times are GMT -6. The time now is 7:56 pm.


This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.