LAX Terminal Construction and Landside Access Modernization Program

Thread Tools
 
Search this Thread
 
Old Oct 21, 2025 | 1:23 pm
  #346  
All eyes on you!
 
Join Date: Mar 2023
Posts: 24
Or we can just walk around with those stupid Metaverse goggles and pretend it's already here.
chrisl137 likes this.
yandorio is offline  
Old Oct 21, 2025 | 1:35 pm
  #347  
All eyes on you!
 
Join Date: Mar 2024
Posts: 164
Originally Posted by bocastephen
While completely devoid of color, Im looking forward to the year 2367 when it opens.
😂😂😂. While I know it wont happen, I which T2 got this treatment. I know it was refurbished not long ago but they mostly created a mall with too much crammed into a small space. The gates in particular are dark and oftentimes overcrowded.
NilesStandish is offline  
Old Oct 22, 2025 | 2:54 pm
  #348  
50 Countries Visited
All eyes on you!
15 Years on Site
 
Join Date: Jan 2010
Posts: 1,713
Has anyone confirmed if the terminal connector tunnel will be closed during construction? T5 was the only terminal that was entirely underground, so it should be OK unless they are worried about it collapsing. I assume the new terminal will have a walkway at concourse level in the front, like there is between T6 and T7?? I enjoyed taking many trips between TBIT and T7 over the years, mainly for lounge access and to get some exercise before a long flight.
Ted likes this.
downinit is offline  
Old Oct 23, 2025 | 1:18 pm
  #349  
20 Countries Visited
3M
100 Nights
10 Years on Site
 
Join Date: Oct 2015
Programs: AA: EXP, 1MM DL: Gold, 1MM Marriott: Ambassador, LTT
Posts: 470
Kind of wild LAWA opened MSC South with almost zero fanfare. I don't even think they did a separate press release on the opening, they just mentioned it in the T5 closure press release. It doesn't appear that they organized any media events, tour for bloggers/reporters, etc. Seems like LAWA is almost embarassed of MSC South.
LovePrunes and E757LGB like this.
BillBurn is offline  
Old Oct 23, 2025 | 1:57 pm
  #350  
All eyes on you!
10 Years on Site
 
Join Date: Mar 2012
Posts: 281
Originally Posted by BillBurn
Kind of wild LAWA opened MSC South with almost zero fanfare. I don't even think they did a separate press release on the opening, they just mentioned it in the T5 closure press release. It doesn't appear that they organized any media events, tour for bloggers/reporters, etc. Seems like LAWA is almost embarassed of MSC South.
Maybe they did invite some folks, but they just didn't want to walk that far.
socalflying is offline  
Old Oct 28, 2025 | 12:45 pm
  #351  
50 Countries Visited
All eyes on you!
15 Years on Site
 
Join Date: Jan 2010
Posts: 1,713
Originally Posted by downinit
Has anyone confirmed if the terminal connector tunnel will be closed during construction? T5 was the only terminal that was entirely underground, so it should be OK unless they are worried about it collapsing. I assume the new terminal will have a walkway at concourse level in the front, like there is between T6 and T7?? I enjoyed taking many trips between TBIT and T7 over the years, mainly for lounge access and to get some exercise before a long flight.
It appears that my question has been answered in the AA forum. The tunnel will be closing in the next week, and it will be replaced with a bus bridge from T4 - T6.
downinit is offline  
Old Nov 7, 2025 | 10:41 pm
  #352  
1M
50 Countries Visited
All eyes on you!
20 Years on Site
 
Join Date: Feb 2005
Location: LAX
Programs: UA 1P 1MM
Posts: 721
Just did the trek from T6 to T4. The bus pretty much left as soon as I got on. I felt like the whole journey took a few minutes. I was trying to go from the United Polaris lounge to the Star alliance lounge in TBIT. It took me 26 minutes (full disclosure, I walk fast)
abaheti likes this.
UALboy is offline  
Old Nov 8, 2025 | 12:03 am
  #353  
A FlyerTalk Posting Legend
10 Countries Visited
Conversation Starter
All eyes on you!
20 Years on Site
 
Join Date: Sep 2002
Location: LAX/TPE
Programs: United 1K, JAL Sapphire, SPG Lifetime Platinum, National Executive Elite, Hertz PC, Avis PC
Posts: 47,221
I did the transfer today from the *A lounge to the United Club. Its still a hike from TBIT to the bus stop, but shockingly the signs are up and clear - but also wrong.

The signs have the bus going to terminal 6 then terminal 8 - but they actually only go to terminal 6.

It took me about 40 minutes total because I had to wait awhile for the transfer bus, its not nearly as frequent as the AA regional concourse bus.

The plus side vs walking the tunnel is a street level view of the passing planes. Given this project will finish just in time for the 2034 Winter Olympics, the bus is something I can get used to.


hirohito888 and E757LGB like this.
bocastephen is online now  
Old Nov 9, 2025 | 5:05 pm
  #354  
50 Countries Visited
All eyes on you!
15 Years on Site
 
Join Date: Jan 2010
Posts: 1,713
Arrived 3 hours early for an AS int'l flight to have time to enjoy the lounges. Entered at T4 with Clear, took 5 minutes to get through. Headed directly to Qantas lounge for some food. Headed back to T6 via T4. There were about 13 people in line for the shuttle to T6 when I arrived. The AA birds near shuttle delart s first, but the T4-T6 shuttle took about 10 minutes after I arrived to depart. 10 minutes later, I was at T6. Still no discernable TSA lines at LAX , but the T4-T6 shuttle is manageable as long as you have at least 30 minutes to spare
downinit is offline  
Old Nov 11, 2025 | 4:00 pm
  #355  
20 Countries Visited
1M
All eyes on you!
15 Years on Site
 
Join Date: Mar 2010
Location: LAX
Programs: AA Plat, DL Gold, AS, UA, IHG Plat
Posts: 2,601
A comprehensive analysis of the mostly nonsensical LAWA proposal to completely redo the access road despite C0 and T9 being permanently on hold (and may never happen)

bzcat is offline  
Old Nov 12, 2025 | 12:25 pm
  #356  
2M
All eyes on you!
10 Years on Site
 
Join Date: Jul 2011
Posts: 2,696
Originally Posted by bzcat
proposal to completely redo the access road despite C0 and T9 being
permanently on hold
(and may never happen)
If it's "permanently on hold", I don't understand the uncertainty about it "may never happen"
⁉️
LovePrunes is online now  
Old Nov 12, 2025 | 12:57 pm
  #357  
20 Countries Visited
3M
100 Nights
10 Years on Site
 
Join Date: Oct 2015
Programs: AA: EXP, 1MM DL: Gold, 1MM Marriott: Ambassador, LTT
Posts: 470
I agree that it doesn't seem to make sense to green light this road reconfiguration until A) they are sure they are actually going to build C0 and C9 B) they finalize the designs of C0 and C9 (what if they want to change the design such that it requires a new roadway config? eg MSC South looks a lot different from the inital design) C) they are 100% confident it won't create problems during the Olympics D) they have some experience with what the actual impact of the people mover et. al. is on traffic within the horseshoe (which one would think could inform the roadway design decisions to some extent).

All this has to be apparent to the LAWA staff as well. One reason I could see them wanting to push ahead is if there was some kind of federal grant money that will expire if they don't start construction. Does anyone know if that's the case? Otherwise this seems like pretty ill-advised timing.

Last edited by BillBurn; Nov 12, 2025 at 3:39 pm
BillBurn is offline  
Old Nov 13, 2025 | 12:02 pm
  #358  
20 Countries Visited
1M
All eyes on you!
15 Years on Site
 
Join Date: Mar 2010
Location: LAX
Programs: AA Plat, DL Gold, AS, UA, IHG Plat
Posts: 2,601
Originally Posted by BillBurn
I agree that it doesn't seem to make sense to green light this road reconfiguration until A) they are sure they are actually going to build C0 and C9 B) they finalize the designs of C0 and C9 (what if they want to change the design such that it requires a new roadway config? eg MSC South looks a lot different from the inital design) C) they are 100% confident it won't create problems during the Olympics D) they have some experience with what the actual impact of the people mover et. al. is on traffic within the horseshoe (which one would think could inform the roadway design decisions to some extent).

All this has to be apparent to the LAWA staff as well. One reason I could see them wanting to push ahead is if there was some kind of federal grant money that will expire if they don't start construction. Does anyone know if that's the case? Otherwise this seems like pretty ill-advised timing.
I'm pretty sure the project is to be funded from LAWA revenue entirely.

The biggest issue to me is that the EIR clearly projects that this will make traffic worse in the horseshoe... And it is obvious if you really think about it. The vehicle capacity of the horseshoe is limited - you can't add anymore lanes or create anymore curb drop off real estate. So allowing more cars into the horseshoe (which is what this project sole intent now that C0 and T9 are cancelled) is going to inevitably result in more congestion inside. It's kind of idiotic to continue pursuing this project.

LAWA should be designing the roadways access to reduce demand, not encourage it. Let the Peoplemover work for a few years and then study the traffic pattern. Implement congestion pricing so traffic doesn't exceed the holding capacity of the horseshoe.
NOLAnwGOLD likes this.
bzcat is offline  
Old Nov 13, 2025 | 12:28 pm
  #359  
FlyerTalk Evangelist
 
Join Date: Jun 2010
Location: TOA
Programs: HH LTDiamond, Marriott LTPP/Platinum Premier, Hyatt Lame-ist, UA MM LT1P
Posts: 21,195
Originally Posted by bzcat
I'm pretty sure the project is to be funded from LAWA revenue entirely.

The biggest issue to me is that the EIR clearly projects that this will make traffic worse in the horseshoe... And it is obvious if you really think about it. The vehicle capacity of the horseshoe is limited - you can't add anymore lanes or create anymore curb drop off real estate. So allowing more cars into the horseshoe (which is what this project sole intent now that C0 and T9 are cancelled) is going to inevitably result in more congestion inside. It's kind of idiotic to continue pursuing this project.

LAWA should be designing the roadways access to reduce demand, not encourage it. Let the Peoplemover work for a few years and then study the traffic pattern. Implement congestion pricing so traffic doesn't exceed the holding capacity of the horseshoe.
Two words: Job Security.

David
DELee is offline  
Old Nov 14, 2025 | 10:47 pm
  #360  
All eyes on you!
15 Years on Site
 
Join Date: Feb 2010
Programs: UA 1K, DL Med, Marriott Plat
Posts: 68
Originally Posted by bocastephen
I did the transfer today from the *A lounge to the United Club. Its still a hike from TBIT to the bus stop, but shockingly the signs are up and clear - but also wrong.
Given the picture you posted, this transfer bus is a new airside one at runway level, correct?