![]() |
Keep checking, and I mean at least every half hour. There is a 1 day online cancellation cutoff, so you are in the sweet spot to grab a 8/26 slot. Tough when only a single opens up, but sometimes families cancel. I speak from recent experience as I had my interview at Champlain a few days ago and got the appt 2 days before.
|
Originally Posted by NanD
(Post 27114210)
Husband and my Nexus application were conditionally approved today.
Both applied June 15, 2016 Conditionally approved August 24, 2016 @ 1:09 AM EST First available interview appointments at Champlain, NY, on August 29, 2016 Our interviews scheduled for Sept 6, 2016 Appreciated the information learned here as enabled us to understand the process better and realize our timing was in line with others. Thanks to all who shared. |
I am keep trying but no luck so far. I booked 17th september (upon my return from New Zealand) at Fort Erie. However, I would love to get something at YYZ or Niagara falls tomorrow or on Friday :)
|
Originally Posted by Crazystar
(Post 27115365)
I am keep trying but no luck so far. I booked 17th september (upon my return from New Zealand) at Fort Erie. However, I would love to get something at YYZ or Niagara falls tomorrow or on Friday :)
|
I checked when I flew into yul on my application (had lots of time). Canada side approved it and it's pending on the usa side. Called up my local GE office and left them a message. Figured it wouldn't hurt. After next week, I won't be in Canada until Dec, so hopefully it'll get approved soon.
At worse I'll take a road trip to Detroit. What's the maximum time one can wait after approval to schedule a appointment? |
My wife received her approval at 11:09 this morning.
The kids and I had our interviews today at 4:00 & 4:30 @ Fort Erie. My wife joined us. Unfortunately they could not take her, as they were backed up today. We arrived at about 3:15, left by 4:15. They said card should be in the mail in about 10 days. A little waiting, but pretty seamless. |
All approved, now waiting for cards
Applied May 31, conditional approval Aug 13, and interview times were wide open in Pembina and Warroad. All 5 of us inteviewed today, took maybe 30 minutes, couldn't get fingerprints for 4YO and finally gave up. Was told that is common for little kids. The machine just wouldn't register them. Now we wait for the cards! Good luck to everyone.
EDIT: forgot to mention I needed nothing but our passports. I brought the letters, birth certificates for the kids and drivers licenses but they didn't look at anything except passports. |
Originally Posted by jason8612
(Post 27117544)
I checked when I flew into yul on my application (had lots of time). Canada side approved it and it's pending on the usa side. Called up my local GE office and left them a message. Figured it wouldn't hurt. After next week, I won't be in Canada until Dec, so hopefully it'll get approved soon.
At worse I'll take a road trip to Detroit. What's the maximum time one can wait after approval to schedule a appointment? |
Originally Posted by jason8612
(Post 27117544)
I checked when I flew into yul on my application (had lots of time). Canada side approved it and it's pending on the usa side. Called up my local GE office and left them a message. Figured it wouldn't hurt. After next week, I won't be in Canada until Dec, so hopefully it'll get approved soon.
At worse I'll take a road trip to Detroit. What's the maximum time one can wait after approval to schedule a appointment? |
Quick approval post interview
I was one of the mid-May (2016) applicants to NEXUS who, in spite of already having Global Entry, experienced a pretty long wait (> 11 weeks) until receiving my conditional approval. Today, I had my interview and iris-scan in Vancouver (downtown) and was delighted to receive an email, just 30-45 minutes later, to my GOES account to inform me of my final approval.
<off topic discussion of GE card validity post NEXUS approval was moved to the The NEXUS Information Thread> |
Joined just to provide an additional data point
Applied 6/12 Conditional Approval 8/28 Interview for 9/6. I could have grabbed one for the 31st but this works better for my schedule |
Time Line
Family of 4.
Date applied: 6-24-16 x 3 members. 6-25-16 X 1. Conditional approval: 10.15 PM eastern time on 8-28-16 for one family member, applied on 6-24-16. Waiting for 3 others. |
Update:
Family of 4. Date applied: 6-24-16 x 3 members. 6-25-16 X 1. Conditional approval: 10.15 PM eastern time on 8-28-16 for two family members, applied on 6-24-16. Waiting for 2 others. |
Nice burst of conditional approvals, thanks all for your updates, should start seeing some July approvals next week.
|
Thanks! Encouraged.
Originally Posted by nexid
(Post 27133748)
Update:
Family of 4. Date applied: 6-24-16 x 3 members. 6-25-16 X 1. Conditional approval: 10.15 PM eastern time on 8-28-16 for two family members, applied on 6-24-16. Waiting for 2 others. I've got a trip coming up on Sept 18 and another in Oct. Woukd be fantastic to get this all set by then. |
| All times are GMT -6. The time now is 11:03 am. |
This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.