The Master Plan has all of T-1 being re-done, including the gates that DL uses.
Instead of having piers and circles of gates, the airport's new look will have all gates in a straight line. Their wish is that you will get cleared at a security point and be able to access all the airlines and their gates.
Phase 2 (2012-2014) will see the removal of the AS gates
Phase 3 (2015-2016) will see 15 gates added and the US/SW gate area removed
Phase 4 (2017-2018) DL gates are removed and mover straight in gates added
Too bad on the DL gates -- actually like that pier -- very airy and bright and not that old. But having airside all connected is a helpful goal.