St. George Airport (SGU) to close for four months during 2019.
A massive structural repair and upgrade project will necessitate a four-month closure of the St. George Regional Airport next year.
Approximately 5,400 linear feet of runway will need to be excavated and replaced as a result of water entering the soil underneath it and damaging the existing runway pavement, creating the need for continual patching. During the anticipated 120-day construction project, the airport will be closed to all flights from April 25-Aug. 21, 2019.
Approximately 5,400 linear feet of runway will need to be excavated and replaced as a result of water entering the soil underneath it and damaging the existing runway pavement, creating the need for continual patching. During the anticipated 120-day construction project, the airport will be closed to all flights from April 25-Aug. 21, 2019.
#3
Join Date: Jan 2010
Location: EUG,PDX
Posts: 482
Originally scheduled for closure from late April through August, the airport will now be closed to all flights from May 29-Sept. 26, 2019, for the runway repair and replacement project.