Community
Wiki Posts
Search

ZRH - Concourse A [Reconstruction]

Thread Tools
 
Search this Thread
 
Old May 20, 2020, 8:21 am
  #1  
Original Poster
 
Join Date: Aug 2018
Location: ZRH
Programs: LX SEN & WoH Globalist
Posts: 274
ZRH - Concourse A [Reconstruction]

Nice documentary report on the new concourse A at ZRH. Unfortunately available in German only but nice to watch anyway...

Neues Dock A am Flughafen Zürich
Gioventu is offline  
Old May 20, 2020, 1:36 pm
  #2  
 
Join Date: May 2016
Programs: LXFF
Posts: 490
Intersting. They go in a lot of detail. Any word on a completion date or if this is pushed back? Mind you it would be easier to build with less air traffic...
ced_lx is offline  
Old May 20, 2020, 4:48 pm
  #3  
Moderator: SAS
Hyatt Contributor Badge
 
Join Date: Feb 2018
Location: BLL & CPH & ZRH
Programs: LX, SK EBD (*G)
Posts: 3,152
Originally Posted by ced_lx
Intersting. They go in a lot of detail. Any word on a completion date or if this is pushed back? Mind you it would be easier to build with less air traffic...
2030ish is what I heard.

Thanks for sharing, very interesting!
Nick Art is online now  
Old May 22, 2020, 7:15 am
  #4  
Hilton Contributor Badge
 
Join Date: Oct 2010
Location: Switzerland
Programs: AY+ Platinum, SK Gold, BAEC Silver, airbaltic VIP, Radisson VIP
Posts: 6,531
Very interesting indeed.

Highlights:

- New Dock A will be able to handle schengen and nonschengen flights
- New Dock A will be able to handle up to 8 widebodies (Code E aircraft) on its north side
- New parking positions (5x Code C (narrowbodies)) between Dock A and B
- New taxiway allowing simultaneous operations
- Connected underground (passport control)
- Bus gates on level 0

Total increase of jetbridges will be +3:
Currently 10 on north side of Dock A, after construction 12
Currently 7 on south side of Dock A, after construction 8.

Dock B will not have Code E gates to the north anymore due to space, so will be able to accomodate 6 Code C aircraft.
florens is online now  
Old May 28, 2020, 4:20 pm
  #5  
 
Join Date: Mar 2005
Location: ZRH, Switzerland
Programs: M&M, Fan of MO, Shangri-La.
Posts: 687
Originally Posted by florens
- New parking positions (5x Code C (narrowbodies)) between Dock A and B
Total increase of jetbridges will be +3:

Dock B will not have Code E gates to the north anymore due to space, so will be able to accomodate 6 Code C aircraft.
...and all the hardstands „H“ and „I“ (Between Dock A and Runway 28) are lost, which is a petty, because they are MUCH closer to the airside center than those dreaded ones near the maintenance base.

As nice and fascinating as this video is, the added value appears questionable to me.
$0.5 to $1 Billion just for a shiny steel and glass structure and 5 years of flying from a construction zone.
Really?
LoungeLizzard is offline  
Old May 29, 2020, 10:56 am
  #6  
 
Join Date: May 2009
Location: SIN (with a bit of ZRH sprinkled in)
Posts: 9,455
Originally Posted by LoungeLizzard
...and all the hardstands „H“ and „I“ (Between Dock A and Runway 28) are lost, which is a petty, because they are MUCH closer to the airside center than those dreaded ones near the maintenance base.

As nice and fascinating as this video is, the added value appears questionable to me.
$0.5 to $1 Billion just for a shiny steel and glass structure and 5 years of flying from a construction zone.
Really?
It's Switzerland. I'm surprised it's not 2 billions and 7 years
YuropFlyer is offline  


Contact Us - Manage Preferences - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

This site is owned, operated, and maintained by MH Sub I, LLC dba Internet Brands. Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Designated trademarks are the property of their respective owners.