FlyerTalk Forums - View Single Post - New Aman/Janu + Azerai/Azumi + GHM/Ahn Luh - '24/'25-Edition
Thread
:
New Aman/Janu + Azerai/Azumi + GHM/Ahn Luh - '24/'25-Edition
View Single Post
Apr 18, 2025 | 5:12 pm
#
71
ngfan
Join Date:
Oct 2002
Location:
Stuttgart, Germany
Programs:
Too many...and an Amanjunkie
Posts:
1,698
Quote:
Originally Posted by
ngfan
As it was raining cats and dogs in South Tyrol yesterday (Easter Sunday) I had some time to kill so I decided to make the long trek from Merano to San Cassiano through inclement weather to check out the construction status of Aman Rosa Alpina...
One year later, same ugly weather, same time to kill, same decision to head over to San Cassiano again to check on the construction status of Aman Rosa Alpina as a courtesy to us Amanjunkies in an FT exclusive:
Restaurant building next to main buidling with main hotel entrance
Main building with entrance
Main entrance
View into main lobby, still a lot of work to be done with large floor to ceiling windows overlooking forest on the opposite side
Hotel overview from village side
Tried to peak into a room on the village side but well...not much to see other than the smoke detector...
Hotel overview from valley/forest side
Main lobby with large floor to ceiling windows in the middle
The lower floor is still under construction, maybe becoming either a restaurant or indoor pool area?
Full width shot of Aman Rosa Alpina from valley/forest/river side, as per April 18, 2025
Majority of exterior structure construction work looks to be complete but finalisation of interior construction seems to need some more months. Wonder if they will be ready in time for the start of winter season 2025/26.
Enjoy!
ngfan
View Public Profile
Find More Posts by ngfan
Post Options