Originally Posted by
DYKWIA
Pretty sure Bond Street was being worked on when I worked in London in 2013! How could it take so long?
There is more detail published online, but I understand that a significant contributory factor that delayed Bond Street was that it was an entry/exit point to/from the tunnel for construction materials in the central section, and that much of the delay stems from complications arising from the use of the Bond Street shaft to get kit in and out.