Originally Posted by
JY1024
Great news on both fronts! That construction has been a nightmare trying to pick up folks from Terminal C!
Excited to see the B-C connector to be done as well. I occasionally like a change of lounge scenery and utilize the options over in C/E. Not a big deal to reclear security if I’m flying out of Terminal B. But would be nice to stay airside…will be a long walk, but a good chance to get my steps in before sitting on the flying school buses!

Just because the B-C Connector will be complete by the summer, I don't think it automatically follows that all the roadway work between B and C will also be complete on the same schedule. They were still doing demolition of the old roadway this past weekend so it seems optimistic that they'll be done with the new roadway in six months. Also, the Massport press release mentioned only the Connector - nothing about the roadway, unfortunately.