Originally Posted by
yyznomad
Isn't this just as busy as any other in-service mainline widebody FIN, more or less?
I was just responding to ITAG per this exchange, and adding C-FNOE's recent activity
Originally Posted by
InTheAirGuy
"Maintenance found a loose connector on the fuel metering unit. The connector was tightened and an engine run successfully performed."
This is encouraging. LOL.
Originally Posted by
24left
Well, little Fin C-FNOE is currently less than 1.5 hours from GRU, so I assume things are going well.