FlyerTalk Forums - View Single Post - Flight in September
View Single Post
Old Aug 28, 2017, 4:08 pm
  #6  
geosch
 
Join Date: Jun 2013
Posts: 286
So far the loan does not have final sign-off and has not been paid out. According to news sources AB's current cash will last approximately into the second half of September (6 weeks after insolvency filing). Moreover, by then they should have achieved the 80% utilization rate for their slots during the present summer season required to keep them (for a buyer), so I would not be surprised if they were to start phasing out operations right after the elections.
Keep an eye on whether that loan will actually be paid out.
geosch is offline