Originally Posted by
AlicorporateUK
If tomorrow's ops board will instigate the procedures for controlled administration (which seems to be the most likely scenario at this moment in time), then it could take up to 6 months before whoever gets designated by the government brisks things up and proceeds to ferry aircraft back to Dublin (lessor). Incidentally, it did happen back in 2008, when the controlled administration lasted for quite a few months (July-January). That aside, all the very latest as they happen on the AZ sub-forum.
G
Thanks, i'll follow along ^
I wouldn't usually worry in these situations but this time i am flying down with a large group (15, on 5-7 different PNRs) to Milan for a company outing so if everything goes as normal that is very fine with me