Originally Posted by
YEGTigger
That's good. That's a little over 6 weeks to convert. I was a bit worried when the first one took 10 weeks. If they keep up that pace with 2 in GSO and 1 in HKG at the same time, the whole fleet would be done by October next year.
I believe the plan is to have them all done before summer.