Originally Posted by
yyz_atc_qq
C-FIVS (742) is back from GSO as of Dec 8, it has already gone to PVG and is due back today (Dec 10). Wiki Updated.
That's good. That's a little over 6 weeks to convert. I was a bit worried when the first one took 10 weeks. If they keep up that pace with 2 in GSO and 1 in HKG at the same time, the whole fleet would be done by October next year.