Originally Posted by
jkatzen
I've got a flight booked ATL-AMS at the end of March.
Currently it's showing the old A333. If they keep the pace of their past mod schedules, though, it looks like they should all be done by then.
When are they thinking they'll all be done?
It looks like it takes on average 5-6 weeks per aircraft and if you are traveling at the end of March there might be 1-2 A333 in the old configuration assuming they are replacing each A332 that comes out with another A332 and likewise with the A333. If they replace like with like getting modded around the early to mid part of April the final A333 will be going in for mods