Originally Posted by
DenverBrian
That's easy. Lot = hard surface on the ground; facility = multilevel. So which is it?
I've no idea. If it is going to cost $3 million, I assume it is a facility.
If it is just open ground, i would expect a dramatic reduction in cost to build - and a reduction in the bond required to pay for it.
I assume we might know more after the Freeholders meeting. I don't see the point in trying to guess.