Originally Posted by
FlytheTail
'Way behind reality. There are 28 finished, 2 in work, and 16 to go. The average time per frame is 38.4 days; minimum is about three weeks (if no other program work is involved), and up to about six weeks or more if scheduled maintenance is also part of the drill.
And it usually is.