DYKWIA Sep 1, 2011 1:52 pm


Originally Posted by NOIR (Post 17025519)
http://gulfnews.com/business/aviatio...ember-1.859359

Dubai airport will be worlds second busiest by November.

Missing the word International :D

NOIR Sep 2, 2011 2:23 am

True, how could I of missed that.

The article is actually well worded because year end it won't be the second busiest international airport. Basically traffic in November will have more traffic, and hopefully every month after that until it catches up to Heathrow in 2015.

ung1 Sep 2, 2011 2:39 am

With such rapid growth, why are they holding back the opening of Jebel Ali Airport? Doesn't it make sense to let some of the smaller, lesser known, non-alliance carriers operate out of there, even if it means poor connectivity? Or is DXB really not bursting at the seams, and only crowded because of EK's business model?

As an aside, I'm surprised DXB overtook HKG, CDG etc at one go, but it'll take years for it to top LHR!

ft101 Sep 4, 2011 10:16 am

I noticed today that Terminals 1 and 3 already have a lot of the signage in place for when the new concourse is ready. Gates 301 - 360 IIRC.

NOIR Sep 11, 2011 6:04 am

http://i56.tinypic.com/25inmtd.jpg

Very good progress. ;)

fly hi Sep 11, 2011 2:25 pm

excellent work.....

NOIR Sep 13, 2011 8:07 am

http://i56.tinypic.com/2zg5hrs.jpg

This pic was taken last week by Face81. As you can see this side should be finished in a month, or so. Once the concourse is sealed off from the harsh climate out side, it can start climate control inside for the best possible finish of the interior fittings.

NOIR Sep 14, 2011 7:21 am

http://i56.tinypic.com/absadw.jpg

A close up of the middle section.

NOIR Sep 15, 2011 12:46 pm

http://www.cnngo.com/shanghai/life/w...59?hpt=hp_bn10

Looks like China isn't going to give DWC the glory of being the largest status.

N830MH Sep 15, 2011 9:01 pm


Originally Posted by ft101 (Post 17052711)
I noticed today that Terminals 1 and 3 already have a lot of the signage in place for when the new concourse is ready. Gates 301 - 360 IIRC.

Excellent! I'm glad hear it. Best of luck to EK will shifting some A380 to new midfield concourse 3. DXB should be consider it done for now.


Originally Posted by NOIR (Post 17089950)
http://i56.tinypic.com/25inmtd.jpg

Very good progress. ;)

Wow!! Looking good!! Keep it up the good work. How much the time when they will be completion constructed second new airports in Dubai.

Jculhane Sep 16, 2011 10:24 am

Still don't understand how the airport can grow the number of passengers to the projected goal with only two runways, especially given the A380 being too wide to allow independent runway control.

NOIR Sep 21, 2011 4:51 am

http://blog.cheapoair.com/news/dubai...-with-ncr.aspx

Dubai Airport authorities reach deal with NCR.

NOIR Sep 26, 2011 6:18 am

http://www.airport-world.com/news-ar...-new-concourse

Dubai airports seeks concessions for new concourse three.

Dubai76 Sep 27, 2011 8:25 am


Originally Posted by Jculhane (Post 17120655)
Still don't understand how the airport can grow the number of passengers to the projected goal with only two runways, especially given the A380 being too wide to allow independent runway control.

Easy, LHR has only 2 !!!!

NOIR Sep 29, 2011 3:38 pm

http://i55.tinypic.com/2u8laoj.jpg

We can officially say concourse three is practically closed off.

Thanks Equario.