FlyerTalk Forums - View Single Post - NEC Shutdown delayed Two Days
View Single Post
Old Jun 21, 2008 | 10:20 pm
  #18  
lexande
 
Join Date: May 2007
Location: NYC
Programs: UA, AA, AGR
Posts: 327
Originally Posted by the_traveler
Shoreline East did at one point run trains from OSB to NLC. However, due to the limited lifting allowed of the Connecticut River drawbridge (just east of the OSB station), they discontinued service (on SLE) to NLC.

You can still use your SLE tickets on regular Amtrak runs between OSB and NLC - but IIRC only on 2 trains. But they are Amtrak trains - not SLE trains - between the 2! And since they are Amtrak trains, and those are not running, there is no rail service during the closure between OSB and NLC!
One train listed as going to New London on http://www.shorelineeast.com/trains.htm , and another listed on the eastbound timetable, are not labeled as Amtrak trains, and do not show up if you do an Amtrak search between NLC and OSB. Is this in error?
lexande is offline