Originally Posted by
Palal
Where did you see that info? AFAIK they're supposed to build a people-move between all three terminals.
They are. Between Terminal A (T3), Terminal B (T2) and Terminal C (next door to the soon-to-be-gone T1).
As soon as T3 is open, SU is moving all of their domestic operations there from T1. Other operators - if there are any left by then - will move to Terminal C or T2. T1 will be either torn down or remodelled for general aviation, private jets and such.