Just returned from SEA, and during a air tour of the area with a friend who is a private pilot, we took off from Renton, and landed at Boeing Field as well as Paine Field (Everett). Between the three, there were 8 DL planes in the final stages of production (on the ramp) if not already doing flight testing. 3 738s, and five 767s, at least three were 764s. So all eight should be delivered within the next month or so, I figure.