Originally Posted by
surryson
have made this point so many times on here.
these would seem the most logical aircraft to retrofit. It would then give them a full fleet of 24J 777s in Q Suite.
my theory is that QR will get rid of its 77L and transfer the Q Suites to those aircraft.