Originally Posted by
FLYaway3x
Interesting, with F-GSQO being refit (didn't have F) there will be at least 24 airframes with F.
Also AF is speeding up their timeframe for refit. F-GSQK was done in 41 days, previously refits at ORY were taking 100 days on average.