Originally Posted by
Reply1984
But what I read here is that, due to the reopening of the Bridge and its location, the utilization rate of the Pier is much lower. This gives the reasons why CX would further expand the Bridge and shut down the Pier.
if this is the case.
Just make the Pier F only.
The brushed J only.
2028 CX should be much larger then CX today