Originally Posted by
joji2022
Going in two weeks and I noticed that overwater pool villas are now available to be booked. They were previously not available as I assume they were near the construction. I’m wondering if that means construction will be pausing?
I think just moving to a different portion of the resort. I e-mailed them and construction should be 100% finished by end of April 2026 and I've booked late May 2026 for 6 nights.
I think they are on schedule as the owner also owns another resort which is scheduled to go under construction after the Conrad is done. What remains to be seen is if it's staying a Conrad or being brought under the WA brand which has been rumored for a few years.