Originally Posted by
The Lev
Just a guess, but I'm assuming a bunch of that time will be spent getting type certification from Transport Canada.
2 to be delivered by the end of 2025 but if I remember correctly, the EIS plan has always been NET Spring/Summer 2026.
It takes about 1 month from entering FAL to rolling off line, it isn't quite final assembly yet, so maybe it will be completed by July/August-ish? I think it's still on schedule to be delivered before the end of the year, the second one should be following closely within a month or two, given their MSN is about 100 apart.
Hopefully they will be loaded to the schedule in October/November for next year.