Originally Posted by
opus99
Paine Field January 31
Matt Cawby has released the firing order for 787s after line 1273.
BAs first GE powered 787 comes in at line number 1308
so really you’re looking at 2026 for delivery of that frame
If I remember correctly, the original delivery timeline was meant to be 2025-2026. Looks like some deliveries could be slipping into 2027. So it looks like BA will only be getting 1 widebody delivery for this year (G-ZBLL), along with a few A320neos and A321neos.