The refurb/reno also affects the '4Urbs' dining area below in G. The entire block in that part of the building is being redone over multiple levels. Veterans may recall that it took FMG a while to build the FCL into the existing terminal area in 2006-07.
Meilensammler reported that the complex cost 6 mio € to build. Before that the HON/F pax had to slum it out in what is the SEN cafe today. (called the HONdehütte).