Originally Posted by oliver2002
T1 (and later a remodeled T2) will become the Lufthansa & friends hub in 2026-29 and everything else will be moved to T3. The connection will become a challenge. The skyline built around the airfield will probably get an airside connection facility.
The current plan of record for the T1-T2-T3 skyline is to have a landside car, and a non-Schengen unclean car, same as the current Skyline, which will move to be entirely airside clean (Schengen and non-Schengen) by the time the T1 remodel finishes.

Note that based on the currently outstanding tender, the T2 rebuild is currently planned to happen from 2028 to 3031, so a few years later than previously thought.