Originally Posted by
HadesNL
Aventine : one whole wing will be done at a time, this is because of the way the plumbing is present in the superstructure.
Each wing is self contained in its plumbing system etc....
It would be a logistic infrastructure nightmare to do it floor by floor .... plus IC AMS is very aware of the renovations drama at IC Parklane London.
How long will it all last?
HadesNL