Originally Posted by
littlevoices
Whilst I like the idea of a new flagship lounge, and recognise that it takes longer to work air-side, but 14-18 months is a long time to be stuck with a China style lounge (I don't remember this one, but generally the quality is fairly poor)
I can say this is the worst among CX-branded lounges.
I have to agree that 14-18 months is a long time. It's also strange as PEK T3E always has construction, I see no time limitation. (Arrived by CX334 & 344 and construction sound everywhere)