FlyerTalk Forums - View Single Post - LAX Terminal Construction and Landside Access Modernization Program
Thread
:
LAX Terminal Construction and Landside Access Modernization Program
View Single Post
Jul 20, 2024 | 5:45 pm
#
271
TWA884
Moderator: Travel Safety/Security, Travel Tools, California, Los Angeles; FlyerTalk Evangelist
Join Date:
Dec 2009
Location:
LAX
Programs:
oneword Emerald
Posts:
24,797
Quote:
Originally Posted by
SPN Lifer
The photos show two-car trains. Will that be standard?
APM Train Car Fact Sheet
Quote:
A total of 44 train cars will be delivered to the APM's Maintenance & Storage Facility, which is the operational hub for the train system. During peak operations(9 a.m. to 11 p.m.), 36 trains will run in four-car sets and arrive every two minutes, with the capacity to move 85 million passengers per year.
---
Each train car holds 50 passengers with luggage; 200 per four-car set.
Train speed will top out at 47 mph. Trains will be available at each station every two minutes with a total of 10 minutes travel time end-to-end.
Reply
TWA884
View Public Profile
Find More Posts by TWA884
Post Options