Originally Posted by
WineCountryUA
The Mezzanine UC space (opened 2013?-closed due COVID in 2020), no windows, down a corridor, up an elevator, down another corridor, about the size of the present E UC. If it has not been converted to office space.
I remember the no windows part. Honestly didn’t know that it was open that long. I thought it closed around the time the “new” UC in E opened.