Originally Posted by
South London Bon Viveur
Having engineering works for both tube, HEX and Elizabeth Line seems sub-optimal to say the least. Might have been better to stagger them over different weekends.....
As discussed upthread, that wasn’t possible as the work is taking place in the T5 station which is shared by all three.