FlyerTalk Forums - View Single Post - FRA Terminal 1 restructuring in 2026; T2 merge into LH/*A hub post 2030
Old Nov 11, 2023 | 7:44 am
  #7  
hch
10 Countries Visited
20 Countries Visited
30 Countries Visited
15 Years on Site
 
Join Date: Jun 2006
Location: INN
Posts: 3,054
Originally Posted by supine
My understanding is that the secure area in T1 is being expanded towards check-in so that a level airside pathway exists between A/Z, B and C, with Schengen on the floor level with A and non-Schengen one floor up level with Z.
​​​​​​
I don't think a walkway between Z and B-Non Schengen is in the current plans, and neither is bi-level gates in B (except for the one they sorta kinda have). Adding this would require completely rebuilding the inner part of B. There were plans to do that complete rebuild years ago, including tearing down the now unused build slicing the B Schengen part in half, but I haven't heard anything about resurrecting it or adding bi-level gates to it. Given that T1 seem in dire need of more Schengen gates I'm also not sure turning B-Schengen into dual Schengen / Non-Schengen gates would buy much. Moving wide body departures off the old part of Z and to T2 would actually help nicely allowing narrow-body turns changing between Schengen and non-Schengen and would reduce the overcrowding there a bit. Maybe that's the plan after T2 reopens?
hch is offline