FlyerTalk Forums - View Single Post - BA fleet: confirmed aircraft deliveries, refurbishment and retirement [2020-2024]
Thread
:
BA fleet: confirmed aircraft deliveries, refurbishment and retirement [2020-2024]
View Single Post
Aug 26, 2023 | 11:34 am
#
1234
HFHFFlyer
Join Date:
Mar 2017
Programs:
BA GGL, GfL, Hilton Diamond, Hyatt Lifetime Globalist, AllAccor Diamond, Marriott Ambassador Elite
Posts:
1,350
Quote:
Originally Posted by
Pilot37
I think 3 new B781 deliveries before yearend would be pushing it for a manufacturer that has had the FAA and airlines looking over every piece of their work for the last 2yrs.
From looking at production lists online, I can see LN1164 (for Korean Air) entered Final Production on June 10th, and still has not been rolled out. BA’s next aircraft are LN1185 / LN1193 and LN1197. Assuming we just look at Charleston produced aircraft - there are 7 aircraft ahead of it to be produced and with essentially only 4 months of the year left to produce all of them ahead of LN1185 (and LN1164 has spent over 2 months in final production), I think the noted (Wiki) February and April delivery spots for these next 3 aircraft would fit with the current production rate.
Pilot37
Very insightful. Thanks!
HFHFFlyer
View Public Profile
Find More Posts by HFHFFlyer
Post Options