Originally Posted by
Porky Speedpig
Does SBAS need any ground equipment Waterhorse?
No, it’s an onboard system. The issue of LV OPS is another matter, there is no LSSA as there is no “beam” to be interfered with but I suspect that most of the other safeguards would need to be kept. The potential is that it can allow lower DA ops without extensive ground installations and redundancies.