Originally Posted by
esquiar
UA should pressure DEN to fix the issue getting passengers between the concourses. The trains are undersized and fill to bulging at Concourse B, making it difficult to load and unload at Concourse A.
Unfortunately, the trains can’t be upsized, but maybe DEN could increase the frequency?
Another idea is adding an underground pedestrian walkway between A and B to reduce pressure on the trains
Heading back to Jeppsen from concourse B is even worse! The train is already bulging with Southwest passengers from concourse C by the time the train gets to B.
Whatever happened to the baggage tunnel with the failed automated baggage system that United abandoned? I believe it was like 1 billion dollars when the airport first opened in the 1995. I'd love to see a walkway from Jeppsen to concourse B via the tunnel.