Thanks Heathrow Tower. Very interesting. The scheme seems to use a series of a variables in a systematic way, which suggests that it lends itself to automation. I assume that controllers would have the final say and ability to override any automated system but do the tools that you use suggest an optimised sequence based on these variables?