Originally Posted by
canadianhockey91
Downgauge aircraft would depend on the reason as if it was due to low load that is to me a monetary reason and would be annoying.
Projected load 6 months out is a reason to make schedule and equipment changes, but the ramifications of the wrong type being on the next place it's supposed to is significant enough that would never happen. AC doesn't have enough aircraft anywhere they can fly a smaller one on a whim.