Originally Posted by
59Impala
I agree, it will be earliest late Q3 if not Q4/2023. unless they do a soft opening during Summer with just 1 floor or so open. But it also does not look like they have done anything to the pool level as far as I can tell from street level. And a pool is required for a Summer in PSP

Based on the rains now and then the super heat in summer, would be interesting to hear from PSP locals how the climactic conditions affect rate/speed at which buildings get built in the area.
Also, has been unclear how much of what was built up to 2019 had to be reinspected, either signed off or redone.
David