Originally Posted by
jamesinclair
Correct, P2 will be renamed as TA. You would have to take a LONG walk to the new garage and then a LONG walk to the new terminal. So long that they will be running shuttle buses to the air train.
The new monorail will be closer to the terminal, and is scheduled to open in *checks notes* 2022. Except they havent even started it.
What's crazy is that those long walks are a lot shorter than what's proposed for terminal B passengers and about the same as what's pr😯posed for terminal C passengers when the replacement train is finally in place.