Originally Posted by
flashware
You're saying it's a high chance, I'm saying it is a crap shoot and that is from multiple real data points by 2x GCH.
i wouldn’t say 66.6% is a high chance, but IMHO, is roughly accurate based on it being a Malaga route in winter. My personal success is a lot higher than 66%, but I’ve tried to factor in the circumstances.
Being 2GCH AFAIK has no greater effect on the system than a single GCH.