Originally Posted by
zen100
Presumably BA could move the CCR checkpoint about 5 metres down the hallway (near the spa entrance), then knock through the spa area, toilets, cabanas and helpdesk, and make a big new area - clearly toilets and helpdesk would need to be re-sited within that area, but still a big net gain in space.
...
.
i'm not sure that would work, I think you forget many people for t5 galleries pass close by the existing entrance and have to be gently guided up the escalator....