Originally Posted by
RockyRobin
Remember the Elizabeth line is not running through to LHR until November so there will be a cross Paddington connection to factor in changing between Elizabeth line branches
Ah - thanks. Presumably undercover and signposted? Roll-on November! Looking at the timetables, it seems as though T2&3 is ideally served by both T4 and T5 trains - so potentially a good service.