Originally Posted by EWR764
I wonder if the stub end of the AeroTrain to the B gates would be part of such a plan.
That "stub end" is intended to go to the new D concourse. Though it might be possible to use the same bore/track for an APM to the international arrivals building. Thought it's a long haul from the C end of the concourse to the D end - meaning either plan international arrivals for that end or also build the planned loop that would connect the APM from the C end to the D end for international arrivals.