Interview with Dulles Airport director re new concourse
Excerpts:
Q:There’s been some big news out of Dulles recently. Can you tell me more about the 14-gate concourse and what it’s going to mean for travelers?
A: If you’re familiar with the C/D concourse — that’s the United Concourse — when that was built, it was built as a “temporary facility.” Well, it’s been around for 20 or 30 years now. We always had intentions to replace it, so this piece that’s coming, Concourse East, will be the first phase of the revitalization of Dulles Airport. It’s going to be a 14-gate addition that’s going to be built right on top of the C train station. If you’re familiar with this train station today, when you go in and you come out of the train, you have a long walk back to the gate. The new concourse will be built right on top of that train station, so you’ll just pop right up through escalators and elevators right into the concourse.
Q: How long will this take to complete?
A: We hope to have it done by 2026.
Q: How does this fit into the larger master plan for Dulles?
A: After we build this concourse we will then extend it across the airfield over time and ultimately replace the C/D concourse. Right now we are going through the planning process to identify the best way to do that. If you think of it today, it would be one large concourse, parallel to the C/D concourse we have today.