Construction progress as at 30 November:
1) MRT Orange Line: 88.46%
2) MRT Pink Line: 84.45%
3) MRT Yellow Line: 89.51%
Testing on the Pink line is between the depot and Bang Chan station.
Construction progress as at 31 January:
1) MRT Orange Line: 90.61%
2) MRT Pink Line: 86.54%
3) MRT Yellow Line: 91.24%
It still seems that most of the MRT Yellow line will open in June/July - Latphrao station may not open until a month later. For the MRT Pink line, the first section should still open in July. Limited testing continues on both, this should be expanded to futher sections of both lines in a month or two.